二维码
萨马伯南

扫一扫关注

当前位置: 首页 » 新闻资讯 » 企业新闻 » 正文

ControlEng adds Energy Cost Model to ServoSoft

放大字体  缩小字体 发布日期:2024-11-11 06:24:21    来源:本站    作者:admin    浏览次数:79    评论:0
导读

  ServoSoft adds Energy Cost Model (ECM), which calculates the system annual and lifetime energy cost, and also provid

  ServoSoft adds Energy Cost Model (ECM), which calculates the system annual and lifetime energy cost, and also provides a straight forward nload="javascript:if(>500)=500" align=right border=0>cost benefit analysis of adding additional capacitance or switching to a regenerative drive.

  Energy accounts for more than 90% of the lifetime costs of most electric machinery. ServoSoft's ECM allows engineers to better understand their design from an energy cost standpoint.

  The ECM calculates the energy cost of the current system, as well as the potential energy cost savings if all the bleeder energy is captured and stored with additional capacitance. By running a detailed power flow analysis with the additional capacitance, ServoSoft determines the system's net energy consumption, which often results in a significant energy cost savings. ServoSoft then presents the results in straight forward dollars and cents, allowing engineers to make a cost benefit analysis of adding additional capacitance or switching to a regenerative drive.

  about ServoSoft

  ServoSoft is an engineering package for engineers who design and work with servo systems. ServoSoft sizes complete servo systems including rotary and linear motors, gear motors, gearboxes, couplings, drives, infeed, bleeder and capacitor modules, with up to 20 axes in a shared bus or stand alone configuration.

 
(文/admin)
打赏
免责声明
• 
部分文章来源于网络,我们均标明出处,如果您不希望我们展现您的文章,请与我们联系,我们会尽快处理。
0相关评论
 

(c)2023-2023 www.pec33.com All Rights Reserved

浙ICP备14008059号